Socket Shield Technique for Immediate and Delayed Implant Placement: A 6-Year Clinical Tria

NACompletedINTERVENTIONAL
Enrollment

25

Participants

Timeline

Start Date

February 1, 2019

Primary Completion Date

July 1, 2025

Study Completion Date

July 1, 2025

Conditions
Alveolar Ridge PreservationImplant Dentistry
Interventions
PROCEDURE

Immediate Implant Placement with SST

Participants underwent extraction and socket shield preparation, followed by immediate implant placement in the esthetic maxillary zone. The implant was inserted at the same surgical session using a flapless or minimally invasive approach. CBCT was used to guide planning and assess ridge dimensions. Healing and follow-up assessments were conducted at 1 year and 6 years post-placement.

PROCEDURE

Delayed Implant Placement with SST

Participants underwent extraction and socket shield preparation. Implant placement was delayed for 6 months to allow soft and hard tissue healing. The implant was placed after verifying shield stability and ridge preservation via CBCT. Follow-up assessments were conducted at 1 year and 6 years post-placement.

Trial Locations (1)

35511

Faculty of Dentistry, Mansoura University, Al Mansurah

All Listed Sponsors
lead

Soaad Tolba Mohammed Tolba Badawi

OTHER

NCT07171866 - Socket Shield Technique for Immediate and Delayed Implant Placement: A 6-Year Clinical Tria | Biotech Hunter | Biotech Hunter