81
Participants
Start Date
April 28, 2025
Primary Completion Date
April 28, 2025
Study Completion Date
June 30, 2025
Manual pressure
Before the procedure in the manual pressure group, the vein entry area will be pressed with the right hand thumb for 10 seconds. The pressure will be applied until the nail bed turns white.
Shotblocker
In the Shotblocker group, the shotblocker will be placed 2 cm above the vein entry point and will remain throughout the procedure.
Necmettin Erbakan University
OTHER