Cut-out-Rescan Procedure Under Different Rubber-Dam Isolation

NACompletedINTERVENTIONAL
Enrollment

20

Participants

Timeline

Start Date

February 24, 2025

Primary Completion Date

February 28, 2025

Study Completion Date

March 14, 2025

Conditions
TruenessIntraoral ScannerRubberdamColor
Interventions
DEVICE

Taking images from the right lower jaw with an intraoral scanner

The patients' mandibular arches were scanned with 4 different intraoral scanners (IOS) (Primescan, Dentsply; Element 5D) prior to the procedure, and the obtained digital impressions were stored as a standard tessellation language (STL) file.

PROCEDURE

Clamp placement on canine and 2nd molar teeth and rubberdam rubber band insertion

The 2nd premolar, 1st, and 2nd molar teeth were isolated with a rubber dam (medium; Nic Tone, Manufacturera Dental Continental) to be included in the operation field. Clamps were placed on the canine and 2nd molar teeth. It was aimed to facilitate the second scanning process by expanding the isolation area to include 3 teeth. A flowable composite was applied by placing Teflon tape on the occlusal surface of the 1st molar to create a difference in its morphology.This stage was repeated in 2 different treatment sessions, blue rubber dam was preferred in one of the appointments and black rubber dam was preferred in the other.

DEVICE

Taking images from the right lower jaw with an intraoral scanner

The patients' mandibular arches were scanned with 2 different intraoral scanners (IOS) (Primescan, Dentsply; Element 5D) prior to the procedure, and the obtained digital impressions were stored as a standard tessellation language (STL) file. The 2nd premolar, 1st, and 2nd molar teeth were isolated with a rubber dam (medium; Nic Tone, Manufacturera Dental Continental) to be included in the operation field. Clamps were placed on the 2nd premolar and 2nd molar teeth. Subsequently, the mesh hole area was rescanned starting on the occlusal surface of the second molar, moving toward the occlusal of the first molar to the occlusal of the second premolar, then the buccal surfaces of the second premolar, followed by the first molar and second molar.

DEVICE

Taking images from the right lower jaw with an intraoral scanner

scanned with 2 different intraoral scanners (IOS) (Primescan, Dentsply; Element 5D) prior to the procedure, and the obtained digital impressions were stored as a standard tessellation language (STL) file. The 2nd premolar, 1st, and 2nd molar teeth were isolated with a rubber dam (medium; Nic Tone, Manufacturera Dental Continental) to be included in the operation field. Clamps were placed on the 2nd premolar and 2nd molar teeth. Subsequently, the mesh hole area was rescanned starting on the occlusal surface of the second molar, moving toward the occlusal of the first molar to the occlusal of the second premolar, then the buccal surfaces of the second premolar, followed by the first molar and second molar.

Trial Locations (1)

34854

Marmara University Faculty of Dentistry, Istanbul

Sponsors

Lead Sponsor

All Listed Sponsors
lead

Marmara University

OTHER