Validity of Computed Guided Technology in Proper Placement of Intermaxillary Fixation Screws in Mandibular Fractures

NAActive, not recruitingINTERVENTIONAL
Enrollment

20

Participants

Timeline

Start Date

April 27, 2024

Primary Completion Date

March 31, 2025

Study Completion Date

April 30, 2025

Conditions
Mandibular Fractures
Interventions
PROCEDURE

intermaxillary fixation using IMF screws

"IMF screws will be placed at the junction of the attached and alveolar mucosa, after verifying the root position on the orthopantomogram (OPG) radiograph. One screw in each quadrant was sufficient; all IMF screws will be placed with the patient under local anesthesia or general anesthesia . Cortical perforation with a 1.5-mm drill bit under copious irrigation will be performed or by self-drilling IMF screws and the IMF screws will be tightened on the drilled hole.~After IMFS placement, intraoperative IMF will be achieved by passing round, stainless steel wires through the screw head to achieve satisfactory occlusion."

PROCEDURE

intermaxillary fixation using IMF screws with surgical guide

"The patient's CBCT images in DICOM format will be converted into stereolithographic (STL) images using the segmentation software.~The converted CBCT STL images will be integrated to obtain the exact tooth morphology Virtual surgical planning (VSP) will be carried out using software to select the exact position of IMF screws placement away from any vital, anatomical or tooth structure.~these locations will be incorporated into the patients specific IMF surgical guides as access holes to direct the IMF screws drill.~Guide will be constructed with a thickness of 2-3 mm and printed using Photopolymer Resin® (Form labs) in the CAD/CAM 3- dimensional (3D) printer"

Trial Locations (1)

41522

Suez Canal University, Ismailia

All Listed Sponsors
lead

Suez Canal University

OTHER