32
Participants
Start Date
March 2, 2022
Primary Completion Date
February 4, 2024
Study Completion Date
February 4, 2024
Y shaped Tunnel with Connective tissue graft
Sulcular incision followed by Micro-periosteal elevator will be used to elevate vertical full thickness tunnel starting coronally from the gingival sulcus and directed apically. CTG will be prepared and inserted into the coronal tunnel aperture using blunt instrument to facilitate intrusion of graft into tunnel. CTG insurted into the tunnel up to the apical level leaving a coronal part to completely cover the recession defect. Finally single interrupted suture will be used to secure the coronal exposed part of the CTG followed by sling suture fixation of the gingival flap with that of CTG. The donor CTG will be stabilized to the underlying connective tissue interproximally using 5.0 sutures.
6 October university, Giza
October 6 University
OTHER