NovoMatrix in Gingival Recession Coverage: Case Series

NARecruitingINTERVENTIONAL
Enrollment

20

Participants

Timeline

Start Date

May 5, 2024

Primary Completion Date

December 15, 2025

Study Completion Date

December 15, 2025

Conditions
Gingival Recession, Generalized
Interventions
PROCEDURE

Subperiostal tunnel in conjunction with Novomatrix

An intrasulcular incision on the tooth with recession and on each adjacent tooth. Subperiosteal pouches dissected apically for about 6-8 mm facial to the 3 teeth and connected by extension of the subperiosteal dissection into the interdental areas to create a tunnel. NovoMatrix trimmed to a vertical dimension of 7-8 mm and a horizontal length to completely over the exposed roots and extend laterally to the root line angles of the adjacent teeth. The graft inserted into the tunnel and aligned. Both the overlying tissue and graft positioned 1mm coronally to the level of the cementoenamel junction and secured with a 6-0 resorbable sling suture.

Trial Locations (1)

1088

RECRUITING

Semmelweis University, Faculty of Dentistry, Budapest

All Listed Sponsors
lead

Semmelweis University

OTHER