33
Participants
Start Date
April 14, 2021
Primary Completion Date
June 14, 2022
Study Completion Date
April 14, 2024
Dental Implant insertion and tooth extraction
"The osteotomies were carried out at a speed of 800 rpm, using sequential burs of similar diameter for both the maxilar and the mandibular side. The drilling protocols followed the recommendations provided by the manufacturer, the Galaxy-Ziacom implant system, for standard drilling.~The insertion of the implants was initiated using a motor handpiece at a speed of 20-50 rpm, without irrigation. The installation process was completed using a manual surgical torque wrench indicator. The maximum torque value (Ncm) reached at the end of implant insertion was recorded as the insertion torque (IT). A total of 264 implants were inserted in 33 patients, 160 implants were post-extraction and 104 implants were inserted after at least one-month post-extraction. The sutures were typically removed 1 week after the surgery, during the postoperative follow-up appointment."
Biointelligent Technology Syst, Barcelona
Universidad Pública de Navarra
OTHER
Dasman Diabetes Institute
OTHER
Biointelligent Technology Systems SL
INDUSTRY