Insertion Protocol of Convergent Transmucosal Design Implants

NARecruitingINTERVENTIONAL
Enrollment

25

Participants

Timeline

Start Date

February 14, 2024

Primary Completion Date

June 30, 2024

Study Completion Date

June 30, 2025

Conditions
Implant Site Reaction
Interventions
PROCEDURE

Equi-crestal Implant placement

A site will be prepared through consecutive drillings on an edentulous space of the osseous ridge after flap elevation. Then a titanium fixture will be screwed that will serve, after osseointegration, to carry a dental prosthesis. The implant will be screwed until the shoulder (upper marginal part of the implant) is exactly at the same level as the bone of the maxillary/mandibular edentulous crest.

PROCEDURE

Sub-crestal Implant placement

A site will be prepared through consecutive drillings on an edentulous space of the osseous ridge after flap elevation. Then a titanium fixture will be screwed that will serve, after osseointegration, to carry a dental prosthesis. The implant will be screwed until the shoulder (upper marginal part of the implant) is 1mm below the level of the bone crest.

Trial Locations (1)

09042

RECRUITING

Policlinico Duilio Casula, AOU Cagliari, Monserrato

All Listed Sponsors
lead

University of Cagliari

OTHER

NCT06254885 - Insertion Protocol of Convergent Transmucosal Design Implants | Biotech Hunter | Biotech Hunter