36
Participants
Start Date
January 10, 2020
Primary Completion Date
January 30, 2023
Study Completion Date
October 1, 2023
overdenture retained by locator attachments.
"• Implant-retained overdenture construction procedures:~1. Primary maxillary and mandibular impressions were made, and custom trays were fabricated using auto-polymerizing acrylic resin.~2. Definitive impressions were made with non-eugenol zinc oxide paste, and the impression copings were threaded to the implants, and polyether material was injected around the copings through the opening of the tray. Auto-polymerizing acrylic resin was used to pick up the copings with the tray. Implant analogs were screwed to the copings and the impressions was poured with stone.~3. Locator abutment (Dentium, Co. Ltd., Korea) screwed in the analogs. Jaw relations were recorded, and semi-anatomical acrylic teeth eeee arranged in balanced occlusion.~4. The locator housing and retentive clips were incorporated into the fitting surface of the overdentures during denture processing."
Khloud Ezzat, Al Mansurah
Mansoura University
OTHER