Osseodensification Versus Conventional Drilling for Implant Site Preparation

NAActive, not recruitingINTERVENTIONAL
Enrollment

34

Participants

Timeline

Start Date

October 31, 2023

Primary Completion Date

December 31, 2024

Study Completion Date

December 31, 2026

Conditions
Dental Implant FailedJaw, Edentulous, PartiallyEdentulous Alveolar RidgeOsseointegration Failure of Dental Implant
Interventions
PROCEDURE

Osseodensification osteotomy preparation

The implant site will be prepared by raising a mucoperiosteal flap. Implant osteotomy will be prepared by using osseodensification technique using Versah burs and a dental implant will be placed. The flaps will then be replaced and sutured with 4/0 polyglycolic acid interrupted and mattress sutures.

PROCEDURE

Standardized osteotomy preparation

The implant site will be prepared by raising a mucoperiosteal flap. Implant osteotomy will be prepared by using either conventional surgical drills provided by Straumann implant systems and a dental implant will be placed. The flaps will then be replaced and sutured with 4/0 polyglycolic acid interrupted and mattress sutures.

Trial Locations (1)

505055

Dubai Dental Hospital, Dubai

All Listed Sponsors
lead

Mohammed Bin Rashid University of Medicine and Health Sciences

OTHER

NCT06034067 - Osseodensification Versus Conventional Drilling for Implant Site Preparation | Biotech Hunter | Biotech Hunter