Immediate Implant Placement in Fresh Extraction Sockets and Delayed Implants in Healed Sockets.

NACompletedINTERVENTIONAL
Enrollment

24

Participants

Timeline

Start Date

February 10, 2018

Primary Completion Date

July 20, 2019

Study Completion Date

November 25, 2019

Conditions
Tooth ExtractionDental ImplantationBone Remodeling
Interventions
DEVICE

Extraction and Implant insertion (test)

"The surgical procedure was conducted under local anesthesia. Intrasulcular incisions were performed around the mesial and distal tooth to the implant recipient site. Buccal and palatal mucoperiosteal flaps were elevated. Tooth extractions were carried out atraumatically using periotomes. Implant site preparation was completed in compliance with the general surgical principles and protocols defined by the manufacturer and screw-shaped implants (UFII, DIO™) were inserted at no less than 35 Ncm. Final insertion torque (IT) was measured and recorded using a manual hand wrench (DIO™). Resonance frequency analysis (RFA) was performed using an Osstell device (Sävedalen, Sweden). For each implant, three Implant Stability Quotient (ISQ) readings were recorded by the same operator to calculate the mean ISQ, at implant placement (T0) and 3 months after implant insertion (T3) prior to final abutment torque and crown cementation.~Absorbable interrupted 4.0 sutures were used for flap closure."

DEVICE

Implant insertion (control)

"The surgical procedure was conducted under local anesthesia. Intrasulcular incisions were performed around the mesial and distal tooth to the implant recipient site. Buccal and palatal mucoperiosteal flaps were elevated, the implant site preparation was completed in compliance with the general surgical principles and protocols defined by the manufacturer and screw-shaped implants (UFII, DIO™) were inserted at no less than 35 Ncm. Final insertion torque (IT) was measured and recorded using a manual hand wrench (DIO™). Resonance frequency analysis (RFA) was performed using an Osstell device (Sävedalen, Sweden). For each implant, three Implant Stability Quotient (ISQ) readings were recorded by the same operator to calculate the mean ISQ. This was done at implant placement (T0) and 3 months after implant insertion (T3) prior to final abutment torque and crown cementation.~Absorbable interrupted 4.0 sutures were used for flap closure."

Trial Locations (1)

1104 2020

Saint-Joseph University, Beirut

All Listed Sponsors
lead

Saint-Joseph University

OTHER

NCT04346706 - Immediate Implant Placement in Fresh Extraction Sockets and Delayed Implants in Healed Sockets. | Biotech Hunter | Biotech Hunter