99
Participants
Start Date
June 15, 2020
Primary Completion Date
September 13, 2021
Study Completion Date
September 13, 2021
Rectal Expulsion Device (RED) - Feasibility
"After a complete physical exam at bedside including a digital rectal exam, the patient is turned on their side and RED is gently inserted into the rectum. The patient is then given one minute to expel RED while remaining on their side. If the patient is unable to pass RED, the patient transfers to a commode and attempts to expel the device. If the device is not expelled, the device can be safely removed at bedside and the patient diagnosed with a biofeedback-responsive evacuation disorder.~The RED device is manufactured by Rose Medical (Grand Rapids, MI) under GMP conditions and final assembly is performed by In2Being (Saline, MI). The device contains accepted technologies that are already in use of humans, namely biomedical grade materials."
Rectal Expulsion Device (RED) - Validation
"After a complete physical exam at bedside including a digital rectal exam, the patient is turned on their LEFT side and RED is gently inserted into the rectum. The patient then attempts to expel RED while remaining on their side. If the patient is unable to pass RED, the patient transfers to a commode and attempts to expel the device. If the device is not expelled, the device can be safely removed at bedside and the patient diagnosed with a biofeedback-responsive evacuation disorder.~The RED device is manufactured by Rose Medical (Grand Rapids, MI) under GMP conditions and final assembly is performed by In2Being (Saline, MI). The device contains accepted technologies that are already in use of humans, namely biomedical grade materials."
Dartmouth-Hitchcock Medical Center, Lebanon
American Gastroenterological Association
OTHER
Dartmouth-Hitchcock Medical Center
OTHER