12
Participants
Start Date
March 3, 2018
Primary Completion Date
January 30, 2019
Study Completion Date
February 28, 2020
immediate loading
"The participants will be assigned to immediate or delayed functional loading groups. In each participant, edentulous areas with adequate thickness of the alveolar bone crest will be identified and at least two sites will be identified for implant installation. All implant recipient sites will be sub-prepared to allow good stability of the implants. Experimental mini-implants (Sweden \& Martina, Due Carrare, Padova, Italy), 3.5 mm in diameter and with an intraosseous portion of 4 mm in length will be installed.~Immediate loading group - A prosthetic component will be applied over the trial implants. Impressions will be taken and a crown / bridge will be provided to patients in one day."
non implant loading
Control implants will receive a healing screw and will remain unloaded
Colombia, Cartagena
ARDEC Academy