31
Participants
Start Date
September 8, 2015
Primary Completion Date
November 30, 2018
Study Completion Date
December 31, 2018
Active tDCS
The anode and cathode sponge electrode (51 cm2) will be placed over C3 and FP2 (10-20 system) respectively. 2 mA current will be applied continuously for 20 minutes.
Sham tDCS
The anode and cathode sponge electrode (51 cm2) will be placed over C3 and FP2 (10-20 system) respectively. 2 mA current will be applied for 30 seconds at the beginning.
Taipei Veterans General Hospital, Taipei
Taipei Veterans General Hospital, Taiwan
OTHER_GOV