683
Participants
Start Date
March 5, 2018
Primary Completion Date
March 15, 2022
Study Completion Date
March 15, 2022
standard scheduling process
Scheduling office assigns start time and room for case and places case on schedule. At this point a default case duration is evaluated by the scheduling office, to see if the value is considered excessively short or excessively long. Depending on the assessment, the scheduling office will either keep the default value, use the value that the surgeon placed in the notes (if available), or the scheduling office provides their own estimation.
assigned a planned case duration value from predictive model
"Predictive model calculates new duration for case at 3AM the day before surgery, and the predictions are made available on a SecureShare-site.~Model predictions are then read by scheduling manager sometime between 7am-10am from the SecureShare site, and the scheduling manager will in EPIC/OpTime, overwrite the current estimate with the new duration value that was generated by the predictive model."
Memoral Sloan Kettering Basking Ridge, New York
Memorial Sloan Kettering Cancer Center
OTHER