12
Participants
Start Date
September 1, 2024
Primary Completion Date
June 1, 2025
Study Completion Date
July 31, 2025
Cryogenx cooling
During the cooling phase of both trials established field based cooling approaches e.g., temperate temperature water spraying (30°C, 5 mL.min-1), and air circulation (electric fan 2 m distance, 1.7 m.s-1 will be implemented. During the CRYOGENX cooling trial, the product will be affixed to the participant's torso in accordance with manufacturer's instructions and they will receive cooling via this intervention in addition to water spraying and air circulation. During the control visit, no intervention will be applied however water spraying and air circulation will be received.
Regular cooling
During the cooling phase of both trials established field based cooling approaches e.g., temperate temperature water spraying (30°C, 5 mL.min-1), and air circulation (electric fan 2 m distance, 1.7 m.s-1 will be implemented. During the CRYOGENX cooling trial, the product will be affixed to the participant's torso in accordance with manufacturer's instructions and they will receive cooling via this intervention in addition to water spraying and air circulation. During the control visit, no intervention will be applied however water spraying and air circulation will be received.
Brunel University
OTHER