12
Participants
Start Date
May 25, 2023
Primary Completion Date
October 10, 2023
Study Completion Date
October 10, 2023
Ventilator modification
The ventilator modification will be fitted to a ResMed Lumis 150, Breas® Nippy 4+ or Vivo 1, 2 or 3 ventilator. The participants oxygen level will be measured with and without the modification in place at their baseline ventilation, and with 1, 2 and 3 litres oxygen extra to their baseline. the researcher will then leave the modification on and slowly reduce the oxygen going into the ventilator, maintaining the participants SP02 at an acceptable level (\>95%)
The Royal Brompton and Harefield Hospitals, London
Royal Brompton & Harefield NHS Foundation Trust
OTHER